    Fallon Middle School Shade Structure Project 

     
    Fallon Shade Structure Project  
    Project Team:
    Architect: DSK
    Project Manager: Craig Lemos
     
     
    Contractor:
    Bay Valley Construction
     
     
    Project Scope:
    Installation of two metal shade structures and site infrastructure. One 30' x 32' shade structure installed adjacent to existing lunch shelter, and one 13' x 20' canopy installed northwest of the Multi-Purpose Room and cafeteria serving lines.
     
     
    Construction Start: Summer 2017
    Construction Completion: Fall 2017